Collective Carpentry$234K · supply + install
The most expensive option in Tier 1 by a real margin. They are also the most engineered, the most insulated, and the most explicitly turnkey-on-the-envelope. The 7-day install with their own crew and crane is not a marketing line — Andrea Michael at Love Schack confirmed it in Issue 03, on a project that hit weathertight in under a week.
What I’m not paying for at $234K: the Net Zero Wall downgrade. 2x6 framing with 1.5-3" of continuous exterior insulation lands somewhere between R-25 and R-30. Cheaper. I’ve followed up to see what that does to the number.